Building Information Modeling
SUMMARY
Building information modeling building project is based on the related information data as the foundation of the model, building model. It has the visualization, coordination, simulated sex, sex can be printed out and optimization of the five characteristics.
Building models of data in the construction of the existing information model is based on a variety of digital technology, thus to the digital information model as the basis of each building project, to each related work. Construction engineering and the related work can be from the building information modeling out of the respective needs information, which can guide and will work corresponding corresponding information feedback to the work of the model.
SYSTEM CHARACTERISTICS
1. The visual: visual namely "see income" form, not only can be used for rendering the generation of the display and statements, and, more important, project design, construction, operation process of communication, the discussion, and decision making are in the state of visualization.
2. Coordination: can help to deal with the problem, that is BIM building information modeling can be built in the early stage of building the collision of each major coordinating, generating coordinate data, provide out. BIM the coordination function can also solve for example: elevator well arrangement and other design layout and headroom requirement of coordination, fire zoning and other design layout of coordination, underground drainage arrangement and other design layout of coordination.
3. Simulated sex: simulative simulation design is not only the building model, also can simulate can't operate in the real world of things. In the design stage, to the need to design BIM simulated something of the simulation.
4. Optimization sex: based on the optimization of the current BIM can do the following:
(1) the optimization of project schemes: the project design and return on investment analysis combined, design change on the influence of the return on investment can real-time calculated.
(2) the special project design optimization: such as the skirt building, curtain wall, roof, big space everywhere can see different design, the content of the proportion of the whole building look is not big, but accounts for investment and workload rate and are often compared to the former, and is usually more difficulty in construction and construction problems more of the place, the content of the construction scheme optimization design, can bring about significant time limit and cost improvement.
5. Can be printed out sex: BIM for everybody can see more daily output architectural design institute of the architectural design drawings, and some processing components drawings.
|